Brief: Discover the ZB200 S460J0 BS5400 HA+20HB Extra Wide Heavy Load Anti Skid Aggerates Bailey Bridge Long Span, the ideal solution for rapid, durable, and versatile bridging needs. Perfect for permanent or temporary use, disaster relief, and rural infrastructure projects, this modular steel bridge offers a clear span of up to 60.96m with heavy load capacity.
Related Product Features:
Modular design for rapid assembly and versatility in various applications.
Can be assembled using light plant or crane-built for flexibility in construction.
簡単に配置するために 標準コンテナに移動し 運搬できます
Long span capability of up to 60.96m for extensive bridging needs.
Robust structure with high fatigue capability and heavy axle load capacity.
Minimal maintenance required, ensuring long life and cost-effectiveness.
Optional accessories like ramps, footwalks, and parapets for enhanced functionality.
Available in painted or galvanized finishes for durability and corrosion resistance.
よくある質問:
What is the maximum span length of the ZB200 Bridge?
The ZB200 Bridge can achieve a clear span of up to 60.96 meters (200 feet), making it suitable for long-span bridging needs.